Friday, December 11, 2009

Mechanical Installation Begins


The first heating and cooling ducts are installed in the extra women's washrooms in the basement.
There has been temporary heat in the building since mid-fall.

Wednesday, December 9, 2009

Piston Installed


Otis Elevator installers put the piston in place.
The elevator runs between the basement and the main floor for moving equipment, chairs and tables.

Piston in the Air


The piston is lowered into the theatre.

Elevator Piston


The piston for the elevator arrives in the back alley by truck from Indiana.

Monday, December 7, 2009

Panels all in place


Over the weekend, Crystal Glass installed the last of the black glass panels on the front of the building.

Next is the restoration of the plaster on the upper facade.

Catering kitchen started




Work has started to raise the level of the catering kitchen floor to the level of the auditorium level, the opening on the left.