Tuesday, June 2, 2009


The new metal roof for the raised portion of the theatre is nearly complete.
The roof over the stage was altered slightly to allow for the installation of a steel structure to support a motorized rigging sytem for the fly gallery.
And tomorrow concrete will be poured for the 3,000 sq. ft. basement floor.

No comments:

Post a Comment