Monday, June 29, 2009

Addition Construction Start


Excavation of the basement of the addition to the theatre has started.
The addition will have a loading dock on the back, freight elevator between the basement and the main floor, and the heating and ventilation equipment on the roof.

No comments:

Post a Comment